See Before You Book

Sample Pool Inspection Report

Every inspection ends with a shareable PDF your buyer, agent and lender can all read. Here is exactly what one looks like.

Download the Sample (PDF)

Open the full PDF to see the exact layout, or scroll down to preview every section right here.

Open Sample Report

This is an illustrative sample. Property details, photos and figures are anonymized examples, not a specific home.

Pool Inspection Report

Sample โ€” DFW Residential Pool

Inspector: Jerico (CPO Certified)

Inspection Type: Standard

Overall Condition

Serviceable, with repairs

High-Priority Items

2

Est. Repair Range

$1,450 - $5,550

Priority Findings

Gas heater not firingHigh priority

Heat exchanger shows corrosion and the unit fails to ignite. Budget for repair or replacement before relying on heat.

Main drain cover out of dateHigh priority

Anti-entrapment cover is past its stamped expiration. Replace for VGB safety compliance before use.

Pump motor nearing end of lifeMedium priority

Bearings are audibly worn. Still operating, but plan for replacement in the near term.

Loose bonding lugMedium priority

Equipment bonding connection is loose at the pump. Have a pro re-secure for electrical safety.

Minor surface staining & loose tileLow priority

Cosmetic. A couple of waterline tiles to re-set and light staining to treat during normal service.

Equipment & Surface Condition

ComponentRatingInspector Note
Pump & MotorFairVariable-speed pump running; bearings noisy, nearing end of service life.
Filter (Cartridge)GoodCartridges clean, no cracks in housing. Pressure within normal range.
Heater (Gas)PoorWill not fire on demand. Corrosion visible on heat exchanger.
Plumbing & ValvesGoodNo active leaks observed. Diverter valves operate correctly.
Plaster / SurfaceFairMinor surface staining and a few shallow crazing cracks. No structural concern.
Tile & CopingGoodA couple of loose waterline tiles; coping sound.
Safety / BondingPoorMain drain cover past date; bonding lug loose at pump.

Water Chemistry at Inspection

MeasurementReadingIdeal RangeStatus
Free Chlorine1.2 ppm1-3 ppmOK
pH7.87.4-7.6High
Total Alkalinity110 ppm80-120 ppmOK
Cyanuric Acid95 ppm30-50 ppmHigh
Calcium Hardness250 ppm200-400 ppmOK

Photo Documentation

Every finding in the report is backed by labeled photos. The PDF includes the actual images; previews shown here.

Equipment pad
Heat exchanger
Pump & motor
Drain cover
Waterline tile
Plaster surface
Bonding lug
Valves & plumbing

Estimated Repair Costs

Ballpark ranges to help you budget and negotiate before your option period ends. Actual quotes vary by equipment brand and scope.

Recommended RepairEstimated Range
Gas heater repair or replacement$600 - $3,500
Main drain cover replacement (VGB)$150 - $350
Pump motor replacement$450 - $1,100
Re-secure bonding lug$100 - $200
Re-set loose waterline tile$150 - $400

Buyers commonly use these estimated costs to request repairs or a price reduction. One repair caught here can cover the cost of the inspection many times over.

What Every Report Includes

  • High-resolution photos of every component
  • Equipment model numbers, age & condition ratings
  • Pool surface condition with severity grading
  • Water chemistry analysis & recommendations
  • Safety compliance status
  • Estimated repair costs for any issues found
  • Priority ranking โ€” what to fix now vs. later
  • Maintenance recommendations going forward

Ready to Schedule?

Standard $400 with a PDF report in 24 hours, or Rush $600 for a same-day inspection.